Photos from the Building Expansion Project 2008 - Page 4
New Mold Dump Car
Old Mold Dump Car removed during Shutdown period (Nov 22, 2008).
New one
tested and installed (Dec 4, 2008).
Sand Cooler Moved
The Sand Cooler was moved nearer to new Shakeout Drum (Dec 4, 2008).
Sand System Belts replaced and runs expanded to connect 2nd Sand
Tower.
Also replaced old Return Sand System Belts (Dec 5, 2008).

2nd Sand Tower work area, controls and accessories being put in place.
Sand Belts for 2nd Tower. The Backup Sand Tower area was assembled, up and
running by Dec 8, 2008.
Check back later for more photos from 2009...